Single "EACH" component makes 5 finished goods parts

We have an upper level part that we buy in "each" units, but every one of those "eaches" makes 5 of the top level assemblies. I know I can force the upper level to manufacture in lots of 5, but do I want to have a material requirement of "0.2 EA" per parent? Is there a better way to do this?

 

Ernie Lowell

Diba Industries