Hello,
We have jobs that have the wrong production burden rate and I am trying to find the source of the problem.
We will take an example of Job 037140-1-1.
The job has 1 operation. The OpCode is Powder Coat Parts and it is OPCode = 12.
When I go to the Scheduling Resources tab, I see that it has Resource GroupID = Powder Coat Line. The Production Burden rate is $29.
This is OpCode = 12.
On the Scheduling Requirements tab, it shows the Resource Group ID = PWDR.
The Resource Group ID = PWDR is this screen. Notice that the burden rate is $145.00.
Why is job 037140-1-1 showing a burden rate of $29.00 and not $145.00?
What am I missing? I thought the Operation is assigned a resource group on Operation > Scheduling Requirements > Resource Groups. I thought we have scheduled the Resource group ID correctly. The incorrect burden rate means that we have an error assigning a resource groupID to an operation.
Thank you,
Heide Warren