PO Suggestion (Expedite, cancel)

Yes it is possible with a BPM

We've done something similar before 

Dora Chavarria
Sr. Consultant
Analysis Services, ERP

Mayan Technologies USA, Inc.

dchavarria@...


When I Check my time phased I have the suggestion for reduce the PO or cancel.  If possible when I will running the PO suggestion, for that the system don't to calculate this information ?  Not only in the time phased, but in the database.  Is this is a configuration that can be removed ?  Thanks.


With epicor 10.0.700.2
Hi Nancy,

You can check Lock qty and Lock date checkboxes in your PO release and when PO suggestion process runs it will ignore this PO for Change suggestions (reduce, increase, expedite) 


 

Dora Chavarria
Sr. Consultant
Analysis Services, ERP

Mayan Technologies USA, Inc.

dchavarria@...




OK, thanks it's works.


If I will need to check the field, lockdate and lockqty, for each PO always.  Because I never need the system say me increase, decrease.  I watched for create the BPM, but the field does not exist in the database.  If possible for check the field automatically ?


thanks


Nancy.

If you are below version 10.1.400.x, then the fields reside in the COMXref table. The BPM will be different between 9.05 and 10.0

From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com]
Sent: Wednesday, April 20, 2016 4:09 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Re: PO Suggestion (Expedite, cancel)





OK, thanks it's works.



If I will need to check the field, lockdate and lockqty, for each PO always. Because I never need the system say me increase, decrease. I watched for create the BPM, but the field does not exist in the database. If possible for check the field automatically ?



thanks



Nancy.