Not sure if this answers your question. Most of our BOMs can be 6 or 7
levels deep. We record production at the final level and back-flush all
of our parts for the entire process at that time. All of the lower
level subassemblies are built as a phantom BOM. All of our child parts
listed under the phantom BOMs pull through when production is recorded
at the final step.
We are on 8.0.811B.
Jerry W. Rodden
Staff Administrator
Production Planning
Cardington Yutaka Technologies Inc
Phone: 419-864-8777 ext. 6209
FAX: 419-864-7771
jrodden@...
[Non-text portions of this message have been removed]
levels deep. We record production at the final level and back-flush all
of our parts for the entire process at that time. All of the lower
level subassemblies are built as a phantom BOM. All of our child parts
listed under the phantom BOMs pull through when production is recorded
at the final step.
We are on 8.0.811B.
Jerry W. Rodden
Staff Administrator
Production Planning
Cardington Yutaka Technologies Inc
Phone: 419-864-8777 ext. 6209
FAX: 419-864-7771
jrodden@...
[Non-text portions of this message have been removed]