Did you figure anything out with this? We're experiencing the same issue. I'd be interested in your findings.
We are on 9.05.702A
How do I get a resource (Tool) to increment the meter with
in the Maint module based on the labor Qty entered?
The labor interface option on the Equipment Maintenance is
set to Quantity
The resource is linked to the specific part.
The resource is called in the job for the part.
I want to trigger a PM based on usages (Meter) of that tool.
Any help?