Does anyone know where the setting is that allows us to apply material burden as a flat rate instead of a percentage of material costs? Tired of digging through menus.
According to the Job Costing Technical Reference manual, it APPEARS as though you can only enter it as a percentage.
HOWEVER, reading between the lines (pg 147 of the 10.2.600 Job Cost Tech Ref), you MAY be able to set it at the Job level (I have NOT tested this) in Job Details > Materials (for the material you want to add the value for) > Detail
At least worth a shot.