Is there any way to limit Resource Groups based on which Operation is selected when building a MOM in the Engineering Workbench?

I’m picturing how the Resources are grouped underneath each Resource Group.

@brantmw Welcome !! i don’t think so natively, but it would not be hard to do this on EngWorkBench.Update pre-processing and throw an exception.

We only assign the group in EWB and do resources at job creation, so I don’t have a sample, but I have a lot of other checks in EWB.

1 Like