We are trying to use Job Parts for the first time. I know in 9 you have to add them to each job manually. We have done that and the yield per says 1 to 1 which is correct. The part quantity is showing as 0 for the job part (qty of 2 make to stock for the main part) and I’m not sure why. Am I missing a step?
Thanks
Melissa
I added a make to stock link for the job part of 2 pcs. Now the job is showing 2 of each for a total of 4 pcs. This is correct. However the raw material is only calculating enough to make 2 pcs. It is not changing to a qty of 4. These parts are not always made together (or don’t have to be) and so we don’t want to change the main part number’s qty per of raw material.
Ok. I started from the beginning and the problem is gone
Can you send some screen prints?