Does anyone know of a way to move something into inspection the same way a PO receipt with Inspection required checked?
I ask because a PO receipt to INSP shows up in time phase. It exists in limbo until the QA team passes the part. but everyone can view the fact that it is in Inspection. This will neither drive a PO if demand is there and Sales can see that there are parts available for their SO’s but cannot ship until passed.
DMR’s will not show in Time phase