Requesting help in understanding Auto Receive on a job.
The scenario is:
- Job has several operations
- Last operation is final inspection with an inspection plan, operation is marked Final Operation and Auto Receive into Inventory.
- During the final inspection, 2 of the parts are marked non-conforming and go into Inspection Processing.
- In Inspection Processing, the 2 parts are put in Passed Qty, with warehouse of Work In Progress, bin WIP, and saved.
What we expected was an INS-ASM transaction putting the 2 pieces back into the job, where we would log into the job on the final inspection operation and complete the 2 parts, doing the final inspection and inspection plan results.
What we got was the INS-ASM transaction but also a MFG-STK transaction before ever logging into the job so we were not able to do the final inspection and inspection plan results. Application Help says auto receive is triggered when you post labor quantities against the operation, which we had not (yet).
So now we have 2 parts in inventory that have not been inspected.
Is this how it works for others? And if so, how do you handle doing a final inspection plan for parts that get tagged with an NCR at final inspection?
Thanks!
Jeff