We need to set up each operation with an option to do in-house or be able to use a sub-contractor. We will not know which to use until the time of the operation. Can anyone help please? Thanks Tim
Version 10.X → 10.Y
This topic covers tips, tricks and known issues for making the jump between the two above sessions.