Is there an option with E10 Engineering Workbench operations to optionally skip the setup time for the operation? The option I would like covers a scenario when an operation uses the same resource (machinery) as the previous operation.
Here is how my configuration works today:
Operation 1: Turn, using machine #1 = 10 min setup + 30 min production time
Operation 2: Face, using machine #1 = 10 min setup + 30 min prod time
Operation 3: Mill, using machine #2 = 10 min setup + 30 min prod time
TOTAL TIME = 30 min setup + 90 min prod = 120 min
Here is the configuration I’d like to have:
Operation 1: Turn, using machine #1 = 10 min setup + 30 min production time
Operation 2: Face, using machine #1 = (no setup) + 30 min prod time
Operation 3: Mill, using machine #2 = 10 min setup + 30 min prod time
TOTAL TIME = 20 min setup + 90 min prod = 110 min
Over the course of a production day, these small differences add up to substantial amounts, impacting production planning.
I recognize there may be several paths with BPMs to achieve the desired end result on a job-by-job basis; I’m hoping there is a system/site configuration switch I’ve overlooked that supports the “skip setup” step.