Does the Quote cost work similar to the Costs in Method Tracker or does it us the Cost method for Company/Plant?

We have been assuming that the Quote costs was rolling up the costs at the time the Quote is created. Similar to what happens when pulling up the Costs for a part in the Method Tracker.

We use Standard Cost for our Make Items and Avg cost for our purchased items.

We would like to know if the Quote is pulling the cost of Make items in BOM using the Make Items Std costs or is it rolling up the costs of the Make items at the time of the creation of Quote, which could differ, if anything was changed on routing details or purchased parts avg costs changed, etc since the last Standard Cost Roll?

Thank you,

Joy Fekkes

Example: