Data Collection / Labor Reporting

I'm still on 5.2 so I don't have that checkbox - but I went to epicor
website to read about it and it states

"This function is new to version 6.10. If this box is checked on a work
center and the work center is used on multiple job operations where an
employee would be clocked into 2 operations at the same time it will split
the labor hours based on production standards using the following:
The split is based on the operation's actual time multiplied by the
operation's expected time divided by the total time."

So, if you estimate is 0, it's multiplying by 0 to arrive at the time on
job. From reading this, I would say to try unchecking that box and it will
probably solve your problem...


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of
Carol Engen
Sent: Thursday, June 23, 2005 3:47 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

My hunch is that if you are asking the system to use Estimates, then you
will have to have Estimates. You could try un-checking that box (probably
you should anyway if you are not using or cannot rely on your estimates).

-----Original Message-----
From: Jeff Christ [mailto:jeff.christ@...]
Sent: Thursday, June 23, 2005 2:35 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

yes

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of Carol Engen
Sent: Thursday, June 23, 2005 2:35 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

If you are on 6.1 (maybe 6.0, but we skipped that one)? Does the Work
Center Master have the box checked that says "Use Estimates"?

-----Original Message-----
From: Jeff Christ [mailto:jeff.christ@...]
Sent: Thursday, June 23, 2005 2:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

No they are not.

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

Labor hours will show up even if there are not estimates put in, but
they do
not show up on the job until the person is clocked off the job. Is the
person still clocked in that you are looking at?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
jeffchrist123
Sent: Thursday, June 23, 2005 3:24 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Data Collection / Labor Reporting

Please Help!

We just started using shop floor data collection terminals. We have
been running into this when we do not have set-up or production times
entered into a operation. When a person is clocked into that
operation for 8 hours we look into the job and no labor time is put
against that operation. We have a lot of time and material jobs and I
was wondering what I can do to collect labor time into these jobs,
without having to put time estimates in for all operations for time
and material jobs? Am I missing something?

Thank You
Jeff Christ
Steel Craft Corp.
262-673-6770 x123


Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links
Please Help!

We just started using shop floor data collection terminals. We have
been running into this when we do not have set-up or production times
entered into a operation. When a person is clocked into that
operation for 8 hours we look into the job and no labor time is put
against that operation. We have a lot of time and material jobs and I
was wondering what I can do to collect labor time into these jobs,
without having to put time estimates in for all operations for time
and material jobs? Am I missing something?

Thank You
Jeff Christ
Steel Craft Corp.
262-673-6770 x123
Labor hours will show up even if there are not estimates put in, but they do
not show up on the job until the person is clocked off the job. Is the
person still clocked in that you are looking at?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of
jeffchrist123
Sent: Thursday, June 23, 2005 3:24 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Data Collection / Labor Reporting

Please Help!

We just started using shop floor data collection terminals. We have
been running into this when we do not have set-up or production times
entered into a operation. When a person is clocked into that
operation for 8 hours we look into the job and no labor time is put
against that operation. We have a lot of time and material jobs and I
was wondering what I can do to collect labor time into these jobs,
without having to put time estimates in for all operations for time
and material jobs? Am I missing something?

Thank You
Jeff Christ
Steel Craft Corp.
262-673-6770 x123




Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links
No they are not.

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

Labor hours will show up even if there are not estimates put in, but
they do
not show up on the job until the person is clocked off the job. Is the
person still clocked in that you are looking at?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
jeffchrist123
Sent: Thursday, June 23, 2005 3:24 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Data Collection / Labor Reporting

Please Help!

We just started using shop floor data collection terminals. We have
been running into this when we do not have set-up or production times
entered into a operation. When a person is clocked into that
operation for 8 hours we look into the job and no labor time is put
against that operation. We have a lot of time and material jobs and I
was wondering what I can do to collect labor time into these jobs,
without having to put time estimates in for all operations for time
and material jobs? Am I missing something?

Thank You
Jeff Christ
Steel Craft Corp.
262-673-6770 x123




Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links
When you look at that job in job tracker, do you see the person time listed
on that operation?

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of
Jeff Christ
Sent: Thursday, June 23, 2005 3:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

No they are not.

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

Labor hours will show up even if there are not estimates put in, but
they do
not show up on the job until the person is clocked off the job. Is the
person still clocked in that you are looking at?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
jeffchrist123
Sent: Thursday, June 23, 2005 3:24 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Data Collection / Labor Reporting

Please Help!

We just started using shop floor data collection terminals. We have
been running into this when we do not have set-up or production times
entered into a operation. When a person is clocked into that
operation for 8 hours we look into the job and no labor time is put
against that operation. We have a lot of time and material jobs and I
was wondering what I can do to collect labor time into these jobs,
without having to put time estimates in for all operations for time
and material jobs? Am I missing something?

Thank You
Jeff Christ
Steel Craft Corp.
262-673-6770 x123




Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links
yes

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:32 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

When you look at that job in job tracker, do you see the person time
listed
on that operation?

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
Jeff Christ
Sent: Thursday, June 23, 2005 3:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

No they are not.

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

Labor hours will show up even if there are not estimates put in, but
they do
not show up on the job until the person is clocked off the job. Is the
person still clocked in that you are looking at?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
jeffchrist123
Sent: Thursday, June 23, 2005 3:24 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Data Collection / Labor Reporting

Please Help!

We just started using shop floor data collection terminals. We have
been running into this when we do not have set-up or production times
entered into a operation. When a person is clocked into that
operation for 8 hours we look into the job and no labor time is put
against that operation. We have a lot of time and material jobs and I
was wondering what I can do to collect labor time into these jobs,
without having to put time estimates in for all operations for time
and material jobs? Am I missing something?

Thank You
Jeff Christ
Steel Craft Corp.
262-673-6770 x123




Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links







Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links
If you are on 6.1 (maybe 6.0, but we skipped that one)? Does the Work
Center Master have the box checked that says "Use Estimates"?

-----Original Message-----
From: Jeff Christ [mailto:jeff.christ@...]
Sent: Thursday, June 23, 2005 2:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

No they are not.

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

Labor hours will show up even if there are not estimates put in, but
they do
not show up on the job until the person is clocked off the job. Is the
person still clocked in that you are looking at?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
jeffchrist123
Sent: Thursday, June 23, 2005 3:24 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Data Collection / Labor Reporting

Please Help!

We just started using shop floor data collection terminals. We have
been running into this when we do not have set-up or production times
entered into a operation. When a person is clocked into that
operation for 8 hours we look into the job and no labor time is put
against that operation. We have a lot of time and material jobs and I
was wondering what I can do to collect labor time into these jobs,
without having to put time estimates in for all operations for time
and material jobs? Am I missing something?

Thank You
Jeff Christ
Steel Craft Corp.
262-673-6770 x123
Does it show the 8 labor hours there on the line?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of
Jeff Christ
Sent: Thursday, June 23, 2005 3:32 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

yes

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:32 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

When you look at that job in job tracker, do you see the person time
listed
on that operation?

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
Jeff Christ
Sent: Thursday, June 23, 2005 3:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

No they are not.

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

Labor hours will show up even if there are not estimates put in, but
they do
not show up on the job until the person is clocked off the job. Is the
person still clocked in that you are looking at?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
jeffchrist123
Sent: Thursday, June 23, 2005 3:24 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Data Collection / Labor Reporting

Please Help!

We just started using shop floor data collection terminals. We have
been running into this when we do not have set-up or production times
entered into a operation. When a person is clocked into that
operation for 8 hours we look into the job and no labor time is put
against that operation. We have a lot of time and material jobs and I
was wondering what I can do to collect labor time into these jobs,
without having to put time estimates in for all operations for time
and material jobs? Am I missing something?

Thank You
Jeff Christ
Steel Craft Corp.
262-673-6770 x123




Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links







Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links
yes

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of Carol Engen
Sent: Thursday, June 23, 2005 2:35 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

If you are on 6.1 (maybe 6.0, but we skipped that one)? Does the Work
Center Master have the box checked that says "Use Estimates"?

-----Original Message-----
From: Jeff Christ [mailto:jeff.christ@...]
Sent: Thursday, June 23, 2005 2:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

No they are not.

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

Labor hours will show up even if there are not estimates put in, but
they do
not show up on the job until the person is clocked off the job. Is the
person still clocked in that you are looking at?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
jeffchrist123
Sent: Thursday, June 23, 2005 3:24 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Data Collection / Labor Reporting

Please Help!

We just started using shop floor data collection terminals. We have
been running into this when we do not have set-up or production times
entered into a operation. When a person is clocked into that
operation for 8 hours we look into the job and no labor time is put
against that operation. We have a lot of time and material jobs and I
was wondering what I can do to collect labor time into these jobs,
without having to put time estimates in for all operations for time
and material jobs? Am I missing something?

Thank You
Jeff Christ
Steel Craft Corp.
262-673-6770 x123





Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links
no

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:36 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

Does it show the 8 labor hours there on the line?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
Jeff Christ
Sent: Thursday, June 23, 2005 3:32 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

yes

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:32 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

When you look at that job in job tracker, do you see the person time
listed
on that operation?

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
Jeff Christ
Sent: Thursday, June 23, 2005 3:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

No they are not.

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

Labor hours will show up even if there are not estimates put in, but
they do
not show up on the job until the person is clocked off the job. Is the
person still clocked in that you are looking at?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
jeffchrist123
Sent: Thursday, June 23, 2005 3:24 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Data Collection / Labor Reporting

Please Help!

We just started using shop floor data collection terminals. We have
been running into this when we do not have set-up or production times
entered into a operation. When a person is clocked into that
operation for 8 hours we look into the job and no labor time is put
against that operation. We have a lot of time and material jobs and I
was wondering what I can do to collect labor time into these jobs,
without having to put time estimates in for all operations for time
and material jobs? Am I missing something?

Thank You
Jeff Christ
Steel Craft Corp.
262-673-6770 x123




Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links







Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links
If you open that labor record through labor entry does it show the 8 hours
there on that job?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf Of
Jeff Christ
Sent: Thursday, June 23, 2005 3:36 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

no

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:36 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

Does it show the 8 labor hours there on the line?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
Jeff Christ
Sent: Thursday, June 23, 2005 3:32 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

yes

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:32 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

When you look at that job in job tracker, do you see the person time
listed
on that operation?

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
Jeff Christ
Sent: Thursday, June 23, 2005 3:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

No they are not.

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

Labor hours will show up even if there are not estimates put in, but
they do
not show up on the job until the person is clocked off the job. Is the
person still clocked in that you are looking at?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
jeffchrist123
Sent: Thursday, June 23, 2005 3:24 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Data Collection / Labor Reporting

Please Help!

We just started using shop floor data collection terminals. We have
been running into this when we do not have set-up or production times
entered into a operation. When a person is clocked into that
operation for 8 hours we look into the job and no labor time is put
against that operation. We have a lot of time and material jobs and I
was wondering what I can do to collect labor time into these jobs,
without having to put time estimates in for all operations for time
and material jobs? Am I missing something?

Thank You
Jeff Christ
Steel Craft Corp.
262-673-6770 x123




Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links







Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links
My hunch is that if you are asking the system to use Estimates, then you
will have to have Estimates. You could try un-checking that box (probably
you should anyway if you are not using or cannot rely on your estimates).

-----Original Message-----
From: Jeff Christ [mailto:jeff.christ@...]
Sent: Thursday, June 23, 2005 2:35 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

yes

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of Carol Engen
Sent: Thursday, June 23, 2005 2:35 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

If you are on 6.1 (maybe 6.0, but we skipped that one)? Does the Work
Center Master have the box checked that says "Use Estimates"?

-----Original Message-----
From: Jeff Christ [mailto:jeff.christ@...]
Sent: Thursday, June 23, 2005 2:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

No they are not.

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

Labor hours will show up even if there are not estimates put in, but
they do
not show up on the job until the person is clocked off the job. Is the
person still clocked in that you are looking at?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
jeffchrist123
Sent: Thursday, June 23, 2005 3:24 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Data Collection / Labor Reporting

Please Help!

We just started using shop floor data collection terminals. We have
been running into this when we do not have set-up or production times
entered into a operation. When a person is clocked into that
operation for 8 hours we look into the job and no labor time is put
against that operation. We have a lot of time and material jobs and I
was wondering what I can do to collect labor time into these jobs,
without having to put time estimates in for all operations for time
and material jobs? Am I missing something?

Thank You
Jeff Christ
Steel Craft Corp.
262-673-6770 x123
No, but when I go to the clock in and clock out time and adjust one or
the other and then go back to the original time then the hours show up.

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:42 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

If you open that labor record through labor entry does it show the 8
hours
there on that job?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
Jeff Christ
Sent: Thursday, June 23, 2005 3:36 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

no

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:36 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

Does it show the 8 labor hours there on the line?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
Jeff Christ
Sent: Thursday, June 23, 2005 3:32 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

yes

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:32 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

When you look at that job in job tracker, do you see the person time
listed
on that operation?

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
Jeff Christ
Sent: Thursday, June 23, 2005 3:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

No they are not.

-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of sarah.vareschi@...
Sent: Thursday, June 23, 2005 2:28 PM
To: vantage@yahoogroups.com
Subject: RE: [Vantage] Data Collection / Labor Reporting

Labor hours will show up even if there are not estimates put in, but
they do
not show up on the job until the person is clocked off the job. Is the
person still clocked in that you are looking at?


-----Original Message-----
From: vantage@yahoogroups.com [mailto:vantage@yahoogroups.com] On Behalf
Of
jeffchrist123
Sent: Thursday, June 23, 2005 3:24 PM
To: vantage@yahoogroups.com
Subject: [Vantage] Data Collection / Labor Reporting

Please Help!

We just started using shop floor data collection terminals. We have
been running into this when we do not have set-up or production times
entered into a operation. When a person is clocked into that
operation for 8 hours we look into the job and no labor time is put
against that operation. We have a lot of time and material jobs and I
was wondering what I can do to collect labor time into these jobs,
without having to put time estimates in for all operations for time
and material jobs? Am I missing something?

Thank You
Jeff Christ
Steel Craft Corp.
262-673-6770 x123




Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links







Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have
already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and
Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links








Useful links for the Yahoo!Groups Vantage Board are: ( Note: You must
have already linked your email address to a yahoo id to enable access. )
(1) To access the Files Section of our Yahoo!Group for Report Builder
and Crystal Reports and other 'goodies', please goto:
http://groups.yahoo.com/group/vantage/files/.
(2) To search through old msg's goto:
http://groups.yahoo.com/group/vantage/messages
(3) To view links to Vendors that provide Vantage services goto:
http://groups.yahoo.com/group/vantage/links
Yahoo! Groups Links