Costing Method STD Estimated Prod Labor

In order to estimate Production Labor you need to know the QTY of the run. SO how does Epicor do this in the Cost Roll-up for STD? Needing to know how it gets the Estimated Production Labor when there isn’t a run. One of our parts has a labor cost that is high and is set to eaches for UOM, I’m thinking this is where it is, but I am not sure.

There is a field on the SITE tab of the part called “Costing Lot Size” that is used to determine the lot size. Any SETUP time you have in your routings will be divided by the lot size to determine the cost.

1 Like