I'm on Vantage 5.1 and have the Quality Module.
If I have parts nonconforming and fail them. (WIP-INS)
On the DMR recommend to and an operation to fix them and return the to the
operation.(DMR-WIP)
How do I add up the cost of the DMR?
In otherwords associate all added operations caused by the DMR?
Patrick Winter
If I have parts nonconforming and fail them. (WIP-INS)
On the DMR recommend to and an operation to fix them and return the to the
operation.(DMR-WIP)
How do I add up the cost of the DMR?
In otherwords associate all added operations caused by the DMR?
Patrick Winter