This is biggest complaint of engineers of the system -- ability to add
material on the fly to Vista, without having to select the "material
sequence" and then, add material. They would like to be able to list add
list of parts via grid entry in 8.0 and let it automatically know if
material is new or not, to add it to the list.
The engineers are starting to look at other systems, whereby, I know if this
was overcome some way, they probably wouldn't be looking for a more
"intuitive" system.
- Becky S. Venneman, CMA, SPHR
Finance/Human Resource Coordinator
Technical Services, Inc.
57006 241st Street
Ames, IA 50010
Phone: 515-232-3188
Fax: 515-232-2953
E-mail: beckyv@...
www.tsiames.com <http://www.tsiames.com/>
www.razorgage.com <http://www.razorgage.com/>
[Non-text portions of this message have been removed]
material on the fly to Vista, without having to select the "material
sequence" and then, add material. They would like to be able to list add
list of parts via grid entry in 8.0 and let it automatically know if
material is new or not, to add it to the list.
The engineers are starting to look at other systems, whereby, I know if this
was overcome some way, they probably wouldn't be looking for a more
"intuitive" system.
- Becky S. Venneman, CMA, SPHR
Finance/Human Resource Coordinator
Technical Services, Inc.
57006 241st Street
Ames, IA 50010
Phone: 515-232-3188
Fax: 515-232-2953
E-mail: beckyv@...
www.tsiames.com <http://www.tsiames.com/>
www.razorgage.com <http://www.razorgage.com/>
[Non-text portions of this message have been removed]